Spring has brought about a change in the weather and that means we will be donning our work clothes and grabbing our tools to work on the house. There is a lot happening right now. Soil tests have been completed at the house site and shortly the land will be surveyed so a deed can be drawn up. We were fortunate to obtain 10,000 bricks from the demolition of the Olds Wagon Works building in Fort Wayne. Fleming Excavating will be hauling the bricks and storing them until construction begins on the basement. Regarding the basement, there have been some modifications to the original plans to accommodate certain requirements. Things are moving forward.